Town of Lima

Water District No. 5

The Town of Lima Water District No. 5 has been approved and is in the design phase. The Town is working with the Town Engineer and Financing Agencies to move the project forward to the construction phase.

Estimated Timeline

 

Jenks Rd. Watermain Transmission Main

On March 18, 2026 the Town Board held a work session to discuss an alternative option for WD#5 that included removing part of the transmission main along Rt. 5/20 and Doran Rd. and the pump station along Doran Rd. with a transmission main along Jenks Rd. connecting Jenks Rd. to Chase Rd.  This alternative option provides the possibility of eliminating the pump station and improving the operational efficiency and redundancy of WD#5.  The Town Board will be considering adding the Jenks Rd. transmission main to the project as an alternate bid at the April 7, 2026 Town Board meeting.  The properties along the proposed Jenks Rd transmission main are not in the water district and will not be required to connect or pay the debt service. Here is a link to the cost summary comparison and maps of the Jenks Rd. transmission main and Doran Rd. pump station options.

Interactive Map:

Below is an interactive map displaying parcels included in the Water District. Note: Existing water mains are blue, new water mains are red, and the included parcels are shaded grey. Click on the red water mains to see constructions dates and a detailed list of parcels included in the district for that particular road. Clicking on each parcel will show the tax map number and address.

Project History:

About

For more about the project, the timeline, and the process.

Learn More

Community Engagement

Find out what we are doing to get feedback from you. Learn how to give your input. Fact sheet and FAQ's are here as well.

Learn More

Summary of Survey Results

View a description and explanation of maps and a cost summary of a possible water district in the Town of Lima.

Learn More